OUT LINE - Yeongtong I PARK 1 1 /58 Location 95, Bandal-ro , Yeongtong-gu , Suwon- si , Gyeonggi -do, Republic of Korea Completion June. 2017 Usage Neighborhood Living Facilities (178rooms) Business Facilities (666 office rooms) 4 th ~20 th floor : Business Facilities 1 st ~3 rd floor : Neighborhood Living Facilities B5 ~ B1 : Parking lot B 6 : Mechanism room Number Of Floors Ground floor 20 / Underground floor 6 Height 99.4m Land Area 5020.30m² (1518.64py) Building Area 61377.6212m² (18566.73py)2 /58 Location 50-1, Yonsei-ro , Seodaemun-gu , Seoul, Republic of Korea Completion August. 2004 Usage Educational research facility (general hospital), Welfare facility Number O f Floors Ground floor 21 / Underground floor 3 Height 99.4m Total Ground Area 171,290 ㎡ (51,815 평 ) Building Area 14,318.41 ㎡ (4,331 평 ) OUT LINE 1 - Shinchon Severance HospitalREASON FOR SELECTION 2 3 /58 The Latest Equipment Schedule to be completed by June 2017 Visit to Construction Site Equipment manager explain di Fire extinguishing pipe BUILDING EQUIPMENT 3 - Cold water supply: B6 floor Fire extinguishing pipe is placed beneath the cold water pipe. 10 /58Expansion tank is for replenishing water used in heat exchange chamber. Since the location of the heat exchange chamber is narrow, expansion tanks are installed separately. BUILDING EQUIPMENT 3 - Cold water supply: B6 floor Expansion tank in B6 floor 11 /58BUILDING EQUIPMENT 3 - Cold water supply: B6 floor There are three booster pumps in B6 floor. Two of them is for cold water, the rest is for fire extinguishing pipe. Cold water pipes are thicker than fire extinguishing pipes. Because of the noise problem, all the facilities are foreign brands. 12 /58Each pipes are connected to sink, laundry room, and bathroom. Since all the pipes are placed together, maintaining and repairing is easy. BUILDING EQUIPMENT 3 - Cold water supply: 4~15 floor By pressure gauge, it is easy to check whether there is any leakage in the pipe. Pipes in hallway 13 /58 Phrough water tank heats the water. Bubble separator Tiny bubbles formed when heating water cause corrosion of the hot water pipe. Bubble separator extract air out of the pipe. Because of the noise problem, all the facilities are foreign brands. 19 /58Pressure reducing valves are installed in vertical pipes of low floors . BUILDING EQUIPMENT 3 - Hot water supply: Pipe flow Hot water pipe system for residents 20 /58Black pipe transfer hot water to shops and residents. Normaly , black pipes are weak to rust, corrosion and scale. However, in i -Park, hot water pipes are made out of stainless steal . Stainless steals doesn’t generate scales inside the pipe. BUILDING EQUIPMENT 3 - Hot water supply: B1 floor 21 /58Pipes are bent in ㄷ shape in order to prevent the expansion and contraction caused by hot water. BUILDING EQUIPMENT 3 - Hot water supply: 3th floor Loop type expansion joint Pipes are welded at each side of the loop to block the unnecessary expansion and contraction. 22 /58BUILDING What is the principle? √ 4 How can manage if it does not work? √ 5 Is there a difference in pipe diameter depending on the application? √BUILDING EQUIPMENT 3 - Extinguishment Facilities : Types used 27 /58 It uses gas instead of water. There are two types of gas extinguish system. Carbon dioxide gas fire prevention equipment dilutes oxygen by carbon dioxide. Incombustibility gas fire extinguishing equipment blows out gases that put out the fire. Gas extinguishing system water spray extinguishing system It uses water and sprinklers to put out fire. There are two types of water spray extinguishing system. Dry pipe sprinkler uses gas to put out fire, but needs water to blow gas out of the head. Wet pipe sprinkler uses water to extinguish fire.BUILDING EQUIPMENT 3 - Extinguishment Facilities : B6 floor 28 /58 Where electronic and mechanical equipment are placed, fire extinguish systems should use clean fire extinguishing agent(gas) instead of water. Gas tank SprinklerBUILDING EQUIPMENT 3 Facilities : B6 floorBUILDING EQUIPMENT 3 35 /58 These days, the size of the fire hydrants are specified in fire extinguishing law. The red pipes contains water for fire hydrants and sprinklers. - Extinguishment Facilities : B1 ~5 floorBUILDING EQUIPMENT 3 36 /58 The equipment for fire extinguishing is placed the same from B1 to B5. There is a fire proof window in front of the equipment rooms. Usually, the windows are kept open by a cord. When there is a fire, the lead melts so that the window are closed . - Extinguishment Facilities : B1 ~5 floorBUILDING EQUIPMENT 3 37 /58 The height of the ceiling is higher in 1~3 floors than others. When the ceiling is farther than 1200mm off from the finish, there should be separate sprinklers. In 1~3 floor, there are two types of sprinklers; upward sprinkler and downward sprinkler . - Extinguishment Facilities : 1 ~3 floorBUILDING EQUIPMENT 3 38 /58 All the passage should be fireproof . So the thermal insulators are covering every ducts. Water pi
1. 원가관리의 필요성(목적)과 4가지 구성요소에 대해 설명원가관리는 궁극적으로 최종 손익금액을 정확하게 예측하여 의사결정을 지원하고 문제가 발생할 경우 적절한 조치를 강구함으로써 건설프로젝트와 건설회사의 전체 수익을 증진시키는 데 그 목적이 있다고 할 수 있다.(13.1.3)원가관리는 건설프로젝트의 소요비용을 예측하는 ~2. 건설프로젝트 원가견적(산정)의 일반원칙 7가지 설명(13.2.1)견적자는 설계자가 의사결정을 위하여 설계의 기본사항을 이해할 필요가 있는 것과 같이 견적의 기본사항을 이해할 필요가 있다. 의사결정에 적용될 수 있는 정확한 비용 정보는 견적의 기본원칙을 토대로 얻을 수 있다. 일반적으로 용인된 견적원칙(GAEP)는 다음과 같다.1)3. 건설 프로젝트 원가견적(산정) 수행절차를 3단계로 나누어 설명(13.2.2)상세견적의 전형적인 방법인 단가견적은 특정한 작업항목과 각 항목에 대한 수량과 단가에 근거하여 건설프로젝트 비용을 결정하는 것이다. (각 작업은 물리적인 작업수량과 그에 연관된 단위비용을 갖으며, )각 작업항목의 비용은 작업수량과 단위비용을 곱하여 산정되고 전체 공사의 비용은 모든 작업항목에 대한 비용의 합으로 산출된다. 이러한 상세겨적 절차는 크게 3단계로 구분할 수 있다.1) 물량산출물량산출은 ~2) 일위대가 산정일위대가는 ~ 의미한다. 일위대가는 자재와 노무에 대한 단위가격과 품(labor)의 수량을 곱하여 산정된다.3) 공사비 계산공사비 계산은 ~ .4. 원가(cost)와 가격(price)의 차이Cost is the expense that a business incurs in bringing a product or service to market. Price is the amount a customer pays for that product or service. The difference between the price that is paid and the cost that is incurred is the profit the business makes when the item sells. If a customer pays $10 for an item that costs the company $5 to produce and sell, the company makes a $5 profit. As prices climb, the cost of living increases.원가란 기업이 생산하는 일정한 제품 또는 제공하는 각종 서비스에 필요한 여러 가지 재료, 노동력 등 생산목적을 위하여 소요된 물건 모두를 화폐가치로 환산하여 나타낸다.가격은 본질적으로 어떤 한 재화가 다른 재화와 교환되는 비율이라고 정의할 수 있다. 다시 말하면, 가격은 어떤 한 재화 1단위를 얻기 위해서 그 대가로 희생해야하는 다른 재화의 단위수, 즉 기회비용으로 표시된다.5. 견적의 방법을 견적의 기능, 정보의 정도, 설계의 진행정도에 따라 크게 2가지로 분류하여 설명.개산견적과 상세견적으로 분류할 수 있다. 우선 개산견적은 설계가 시작되기 전에 프로젝트의 실행 가능성을 알아보거나 설계의 초기단계 또는 진행단계에서 여러 설계대안의 경제성을 평가하기 위하여 수행한다. 개산견적은 공사금액을 예측한다는 의미에서 개념견적(conceptual estimates), 기본견적(preliminary estimates), 예산견적(budget estimates) 등으로 표현하기도 한다. 일반적으로 개산견적은 설계도면과 시방서가 준비되지 않는 상태에서 공사비를 예측하기 때문에 이전의 유사한 공사에서 얻을 수 있는 자료와 건설프로젝트 참여자로부터 얻을 수 있는 가능한 정보를 토대로 견적자의 경험과 판단에 의해 수행된다.반면에 상세견적은 보통 설계의 최종단계 또는 공사입찰이나 시공계획단계에서 수행되기 때문에 최종견적, 명세견적, 입찰견적 등으로 표현하기도 한다. 즉. 상세견적은 상세설계의 출력인 일련의 완성된 도면과 시방서에 근거하여 건설프로젝트를 수행하는데 소요되는 재료, 노무, 장비 등에 대한 상세한 수량과 비용을 결정하는 것이다. 이러한 상세견적은 상세설계단계에서 견적기술자가 공사예정가격을 결정하기 위하여 수행하거나 계약자(시공자)가 입찰서를 제출하고 시공계획과 실행예산을 수립하기 위하여 수행.7. 공사비 영향변수(요인)을 크게 3가지로 분류하여 설명- 수량 품질 가격레벨공사비 개산견적을 위해서는 공사비 영향변수를 찾아내고 설정하는 것이 중요한 의미를 가진다. 그에 따라, 다양한 공사비 영향변수 분류가 있지만, 이러한 분류 중 플라나간은 건물 구성요소의 비용, 즉 공사비에 영향을 주는 요인을 수량(quantity), 품질(quality = design, materials, workmanship,performance 등), 가격레벨(price level = market)의 3가지로 대별하고 있고, 각 요인은 세부 영향변수를 포함하고 있다. 기본적으로 공사비가 수량과 단가의 곱으로 구해진다고 볼 때, 이러한 분류를 다시 정리하면 일부 품질 요인은 수량에도 영향을 줄 수 있지만 대부분의 품질과 가격레벨 요인은 공사비 단가에 영향을 미치는 요인으로 분류될 수 있다.8. 공사비분류체계를 활용 목적과 방법에 따라 크게 2가지로 구분하여 설명원가정보의 주요 구성체계인 공사비 분류체계는 원가관리업무 수행의 연계성 확보와 정보의 체계적 축적 및 활용에 있어 근간이 된다. 건축공사비는 분류방식에 따라 공종(trade)별 분류와 빌딩구성요소(BE:Building Element)별 공사비 분류로 크게 구분할 수 있다. 공종별 공사에 투입될 자원의 상세내역 항목이 분류된 공사비 정보인 공종별 분류체계는 공사를 직접 수행하기 위한 정보로서 유용하며, 공사 전단계 보다 공사를 수행하는 시점에서 더 유용하다. 국내의 경우 기존 개산견적 방법론들은 공종별 공사비 분류를 기반으로 구축되는 것이 일반적이지만, 공종별 공사비 분류는 사업의 초기 단계에 설계가 확정되지 않은 상태로 빌딩구성 요소와 시스템에 대한 다양한 대안을 검토하면서 설계를 진행해야 하는 시점의 의사결정 지원을 위한 효과적인 공사비 정보제공에는 무리가 있었다. 즉, 공사 전 단계인 계획 및 설계단계의 공사비 견적과 분석에는 빌딩구성요소별 분류체계가 유용하다. 이는 설계가 확정되지 않는 상태에서 여러 가지 시스템 대안들의 공사비 변화를 분석하면서 예산에 적합한 설계를 진행해 나가는데 유리하기 때문으로 판단된다. 앞으로는 이 두 체계의 연계가 필요하다.