• AI글쓰기 2.1 업데이트
  • AI글쓰기 2.1 업데이트
  • AI글쓰기 2.1 업데이트
  • AI글쓰기 2.1 업데이트
PARTNER
검증된 파트너 제휴사 자료

일제강점기 도청사·부청사 건립의 배경과 성격 (Construction of To and Pu Government Office Buildings in Colonial Choson)

12 페이지
기타파일
최초등록일 2025.05.14 최종저작일 2008.02
12P 미리보기
일제강점기 도청사·부청사 건립의 배경과 성격
  • 미리보기

    서지정보

    · 발행기관 : 대한건축학회
    · 수록지 정보 : 대한건축학회논문집 / 24권 / 2호 / 195 ~ 206페이지
    · 저자명 : 김명선, 박정대

    초록

    During the period of colonial Choson, there were a total of 13 To (道) government office buildings, and as few as 12 and as many as 22 Pu (府) government buildings. In the beginning of that period, To and Pu government buildings were mainly housed in pre-existing facilities that had initially been constructed as Togwanchalbu (道觀察府) or the Japanese Lisachung (日本理事廳), as well as other types of facilities. Eight out of the nine newly established Pu's in the 1930's continued to make use of pre-existing buildings. It was towards the latter half of the 1920's that To and Pu offices began to be newly constructed. In the case of To offices, even earlier cases of new construction existed. The main reasons that spurred these particularly early new constructions were the relocation of a To office building to a different city; the relocation of the To government building within the same city; or the loss of a facility due to fire. Additionally, for both To's and Pu's, there were a few instances where older, pre-existing buildings were enlarged or remodeled for continued use.
    The five main reasons to invest in new construction were, 1) the relocation of a To government building or the new designation of a Pu; 2) the deterioration of a facility or subsequent lack of space due to an increase in activities and employees; 3) the loss of a building due to a fire; 4) the subsequent off-center location of a Pu due to the relocation or growth of the town's administration district; or 5) the desire to provide a building that fittingly reflects the prestige and dignity that a To or Pu was believed to possess. Among these five reasons, the second demonstrated the most need for the new construction of To and Pu government buildings. Many To and Pu officers simultaneously requested that the Choson Government-General grant them permits for new construction, but insufficient funds prevented their demands from easily being met. For this reason, some To and Pu officers would apply for a building permit while also donating funds or land for the construction, which would have been secured as contributions from the townspeople. In this manner, the people of some To‘s and Pu's ended up partially carrying the burden of building construction costs. In the end, new construction for To and Pu government buildings came to realization only after their need reached urgent status, which shows how little the Choson Government-General was active in the construction of To and Pu office facilities. However, records show that the construction of new To offices of Pyongbuk (平北), Kyongnam (慶南), and Choongnam (忠南) were executed at the same time that the operation of these buildings were transferred to key points along the railroad connecting Pusan (釜山) and Manchuria. Also, the construction of Hambuk (咸北) To's office building occurred at the time of its relocation to the military city of Nanam (羅南). Both of these cases demonstrates that the Choson Government-General implemented the construction of To office buildings not in response to local needs, but for the overall interest of imperialist Japan.

    영어초록

    During the period of colonial Choson, there were a total of 13 To (道) government office buildings, and as few as 12 and as many as 22 Pu (府) government buildings. In the beginning of that period, To and Pu government buildings were mainly housed in pre-existing facilities that had initially been constructed as Togwanchalbu (道觀察府) or the Japanese Lisachung (日本理事廳), as well as other types of facilities. Eight out of the nine newly established Pu's in the 1930's continued to make use of pre-existing buildings. It was towards the latter half of the 1920's that To and Pu offices began to be newly constructed. In the case of To offices, even earlier cases of new construction existed. The main reasons that spurred these particularly early new constructions were the relocation of a To office building to a different city; the relocation of the To government building within the same city; or the loss of a facility due to fire. Additionally, for both To's and Pu's, there were a few instances where older, pre-existing buildings were enlarged or remodeled for continued use.
    The five main reasons to invest in new construction were, 1) the relocation of a To government building or the new designation of a Pu; 2) the deterioration of a facility or subsequent lack of space due to an increase in activities and employees; 3) the loss of a building due to a fire; 4) the subsequent off-center location of a Pu due to the relocation or growth of the town's administration district; or 5) the desire to provide a building that fittingly reflects the prestige and dignity that a To or Pu was believed to possess. Among these five reasons, the second demonstrated the most need for the new construction of To and Pu government buildings. Many To and Pu officers simultaneously requested that the Choson Government-General grant them permits for new construction, but insufficient funds prevented their demands from easily being met. For this reason, some To and Pu officers would apply for a building permit while also donating funds or land for the construction, which would have been secured as contributions from the townspeople. In this manner, the people of some To‘s and Pu's ended up partially carrying the burden of building construction costs. In the end, new construction for To and Pu government buildings came to realization only after their need reached urgent status, which shows how little the Choson Government-General was active in the construction of To and Pu office facilities. However, records show that the construction of new To offices of Pyongbuk (平北), Kyongnam (慶南), and Choongnam (忠南) were executed at the same time that the operation of these buildings were transferred to key points along the railroad connecting Pusan (釜山) and Manchuria. Also, the construction of Hambuk (咸北) To's office building occurred at the time of its relocation to the military city of Nanam (羅南). Both of these cases demonstrates that the Choson Government-General implemented the construction of To office buildings not in response to local needs, but for the overall interest of imperialist Japan.

    참고자료

    · 없음
  • 자주묻는질문의 답변을 확인해 주세요

    해피캠퍼스 FAQ 더보기

    꼭 알아주세요

    • 자료의 정보 및 내용의 진실성에 대하여 해피캠퍼스는 보증하지 않으며, 해당 정보 및 게시물 저작권과 기타 법적 책임은 자료 등록자에게 있습니다.
      자료 및 게시물 내용의 불법적 이용, 무단 전재∙배포는 금지되어 있습니다.
      저작권침해, 명예훼손 등 분쟁 요소 발견 시 고객센터의 저작권침해 신고센터를 이용해 주시기 바랍니다.
    • 해피캠퍼스는 구매자와 판매자 모두가 만족하는 서비스가 되도록 노력하고 있으며, 아래의 4가지 자료환불 조건을 꼭 확인해주시기 바랍니다.
      파일오류 중복자료 저작권 없음 설명과 실제 내용 불일치
      파일의 다운로드가 제대로 되지 않거나 파일형식에 맞는 프로그램으로 정상 작동하지 않는 경우 다른 자료와 70% 이상 내용이 일치하는 경우 (중복임을 확인할 수 있는 근거 필요함) 인터넷의 다른 사이트, 연구기관, 학교, 서적 등의 자료를 도용한 경우 자료의 설명과 실제 자료의 내용이 일치하지 않는 경우

“대한건축학회논문집”의 다른 논문도 확인해 보세요!

문서 초안을 생성해주는 EasyAI
안녕하세요 해피캠퍼스의 20년의 운영 노하우를 이용하여 당신만의 초안을 만들어주는 EasyAI 입니다.
저는 아래와 같이 작업을 도와드립니다.
- 주제만 입력하면 AI가 방대한 정보를 재가공하여, 최적의 목차와 내용을 자동으로 만들어 드립니다.
- 장문의 콘텐츠를 쉽고 빠르게 작성해 드립니다.
- 스토어에서 무료 이용권를 계정별로 1회 발급 받을 수 있습니다. 지금 바로 체험해 보세요!
이런 주제들을 입력해 보세요.
- 유아에게 적합한 문학작품의 기준과 특성
- 한국인의 가치관 중에서 정신적 가치관을 이루는 것들을 문화적 문법으로 정리하고, 현대한국사회에서 일어나는 사건과 사고를 비교하여 자신의 의견으로 기술하세요
- 작별인사 독후감
  • EasyAI 무료체험
해캠 AI 챗봇과 대화하기
챗봇으로 간편하게 상담해보세요.
2025년 10월 10일 금요일
AI 챗봇
안녕하세요. 해피캠퍼스 AI 챗봇입니다. 무엇이 궁금하신가요?
9:15 오후