EXERCISE 2-12 Moody Corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. At the beginning of the year, the company made the following estimates:
1. Compute the plantwide predetermined overhead rate.
Overhead rate=(fixed manufacturing overhead cost/machine-hours required to support estimated production)+variable manufacturing overhead cost
= (650000/100000)+3
= 9.5