WWE2 - Example 5.24
A Part of Primary Settling Tank Design - Circular Settling Tank(원형침전지)
본문내용
< Question >
Determine the percentage increase in the hydraulic and solids-loading rates of the primary settling facilities of a treatment plant when 200 of settled waste activated sludge containing 2000 of suspended solids is discharged to the existing primary facilities for thickening. The average plant flowrate is 20000 and the influent suspended-solids concentration is about 350. The design overflow rate for the primary settling tanks without the waste solids is 32 and the detention time is 2.8h.Do you believe that the added incremental loading will affect the performance of the primary settling facilities? Document the basis for your answer.
A Part of Primary Settling Tank Design - Circular Settling Tank(원형침전지)
참고 자료
Metcalf & Eddy, George Tchobanoglous, Franklin L. Burton, Wastewater Engineering, McGraw-Hill