ECDIS에 의한 준설선의 작업공정 관리 및 평가
(주)코리아스칼라
- 최초 등록일
- 2023.04.05
- 최종 저작일
- 2007.08
- 10페이지/ 어도비 PDF
- 가격 4,000원
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 한국수산해양기술학회(구 한국어업기술학회)
ㆍ수록지정보 : 수산해양기술연구 / 43권 / 3호
ㆍ저자명 : 이대재
영어 초록
This paper describes on the evaluation and management of work process in suction hopper dredger and grab bucket dredger as an application of a PC-based ECDIS system. The dynamic tracking of dredging bucket and the data logging of grab dredging information were performed by using the grab dredging vessel "Kunwoong G-18". The position and route tracking of the dredger moving toward the ocean dumping site of dredged material was performed by using the hopper dredging vessel "Samyang-7". The evaluation of wok process in the dredging field, for grab dredger, was continuously carried out on January to May, 2006, in Incheon Hang and for hopper dredger, on July to December, 2003, in Busan Hang, Korea. The dredging information, such as dredger's position, heading, dredging depth and route track which was individually time stamped during the dredging operation, was automatically processed in real-time on the ECDIS and displayed simultaneously on the S-57 ENC chart. From these results, we conclude that the ECDIS system can be applied as a tool in order to manage the work process during the dredging operation, and also in order to generate the factual record of the dredging activities that is sufficient for dredging inspector to accurately evaluate the contract performance even in the absence of a full-time onboard inspector.
참고 자료
없음
"수산해양기술연구"의 다른 논문
더보기 (1/6)