조사시험용 압력용기의 고온고압시험
(주)코리아스칼라
- 최초 등록일
- 2016.04.01
- 최종 저작일
- 2008.12
- 6페이지/ 어도비 PDF
- 가격 4,000원
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 한국기계기술학회
ㆍ수록지정보 : 한국기계기술학회지 / 10권 / 4호
ㆍ저자명 : 박국남, 윤영중, 전형길, 안성호, 이기홍, 김영기, Timothy C. Kennedy
목차
Abstract
1. 서 론
2. 실험목적 및 조건
3. CEDM장치 개조
4. 고온고압 시험 수행
5. 시험결과
6. 결 론
참 고 문 헌
영어 초록
The In-Pile Section(IPS) is located inside the reactor pool. It is divided into 3-parts; the in-pool pipes, the IVA(IPS Vessel Assembly) and the support structures. The test fuel is loaded inside a double wall, inner pressure vessel and outer pressure vessel, to keep the functionality of the reactor coolant pressure boundary. The IVA is manufactured by local company and the functional test and verification were done through pressure drop, vibration, hydraulic and leakage tests. A IVA has been manufactured by local technique and have finally tested under high temperature and high pressure. The IVA and piping did not experience leakage, as we have checked the piping, flanges, assembly parts. We have obtained good data during the three cycle test which includes a pressure test, pressure and temperature cycling, and constant temperature.
참고 자료
없음