SAP PP (Production Planning) 실무 step1 PP material master 정복 (스텝별 스크린샷)
- 최초 등록일
- 2013.02.15
- 최종 저작일
- 2013.02
- 14페이지/ 어도비 PDF
- 가격 3,000원
소개글
실무에 사용되는 SAP PP material master (스크린샷과 함께 모든 step 따라하기)
목차
1 KEY CONCEPTS
2. TRANSACTIONAL USER GUIDE
2.1 Create/Extend Material Master
2.1.1 MRP1 View
2.1.1.1 General Data
2.1.1.2 MRP Procedure
2.1.1.3 Lot Size Data
2.1.1.4 Procurement
2.1.1.5 Scheduling
2.1.1.6 Net requirements calculation
2.1.2 MRP2 View
2.1.2.1 Forecast Requirements
2.1.2.2 Planning
2.1.2.3 Availability Check
2.1.2.4 Plant-specific configuration
2.1.2.5 BOM explosion/dependent requirements
2.1.3 Work Scheduling
2.1.3.1 General Data
2.1.3.2 Tolerance Data
2.1.3.3 Lot size dependent in-house production time
2.1.3.4 Lot size independent in-house production time
2.1.4 Accounting
2.1.4.1 Currency Valuation
2.1.5 Costing
2.1.5.1 General data
2.1.5.2 Quantity structure data
2.1.5.3 Valuation data
2.2 Change Material Master
2.3 Display Material Master
2.4 Materials Listing
3 ADDITIONAL INFORMATION
4 COUNTRY SPECIFIC INFORMATION
본문내용
Main views of Material Master that related to PP/PC and MRP are MRP1, MRP2, Work Scheduling, Accounting and Costing.
Basic Data view cannot be changed in COSMOS as it is valid across all systems – COSMOS, CAT or LU. It is changed in SPASS and then populated to COSMOS.
Plant specific data like MRP1 view will be edited by the local MM coordinator.
<중 략>
Fields/Column User Action and Values Comments
Base Unit of Measure
None
Copy from Basic Data
Unit of Issue
None
Issuing unit from warehouse. The base unit of measure will be use if its blank
Production Unit
None
Unit relating to production
P-S matl status
None
Status of material in the plant
Valid From
None
When will the status take effect
Prod Scheduler
PSC
Scheduler in charge of production activity
Insp Stock
None
Specifies if GR of stock will go to inspection
Batch Management
Checked
Specifies if material is managed in batches
참고 자료
없음