검사공정의 작업배분을 위한 휴리스틱 알고리즘 개발
(주)코리아스칼라
- 최초 등록일
- 2016.04.02
- 최종 저작일
- 2008.09
- 13페이지/ 어도비 PDF
- 가격 4,500원
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 대한안전경영과학회
ㆍ수록지정보 : 대한안전경영과학회지 / 10권 / 3호
ㆍ저자명 : 이석환, 박승헌
영어 초록
In this paper, we developed a heuristic algorithm to assign job to workers in parallel line inspection process without sequence. Objective of assigning job in inspection process is only to assign job to workers evenly. But this objective needs much time and effort since there are many cases in assigning job and cases increase geometrically if the number of job and worker increases. In order to solve this problem, we proposed heuristic algorithm to assign job to workers evenly. Experiments of assigning job are performed to evaluate performance of this heuristic algorithm. The result shows that heuristic algorithm can find the optimal solution to assign job to workers evenly in many type of cases. Especially, in case there are more than two optimal solutions, this heuristic algorithm can find the optimal solution with 98% accuracy.
참고 자료
없음
"대한안전경영과학회지"의 다른 논문
더보기 (5/10)