하수처리와 연계한 기존 침출수 처리시설의 개선방안
(주)코리아스칼라
- 최초 등록일
- 2016.04.02
- 최종 저작일
- 2007.02
- 19페이지/ 어도비 PDF
- 가격 5,400원
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 대전대학교 환경문제연구소
ㆍ수록지정보 : 大田大學校 環境問題硏究所 論文集 / 11권
ㆍ저자명 : 임봉수, 어성욱, 손봉호
영어 초록
This study presented the plan for treatment plant as investigating the technical examination of existing landfill leachate treatment plant at Geumgo-Dong and the plan of landfill leachate treatment with sewage treatment. The R/O process in 1st stage landfill leachate treatment plant(plant capacity:150m3/d) was closed in consideration of economical aspect and efficiency. It is to be desired that the 1st stage and 2nd stage landfill leachate treatment (plant capacity: 250m3/d) are combined, and are converted the Pretreatment process with nitrogen treatment process, and after total landfill treatment leachate happened from landfill site is pretreated it is transferred the sewage treatment plant. Ammonia nitrogen load of landfill leachate that was transferredthe sewage treatment plant(plant capacity: 300,000m3/d). This load is no problem at now, but it is need change the inflow line for sewage treatment plant and the enlargement of pretreatment process in case that the raw landfill leachate is increased.
참고 자료
없음
"大田大學校 環境問題硏究所 論文集"의 다른 논문
더보기 (2/7)