런던아이의 디자인 전개와 건립과정에 관한 연구

(주)코리아스칼라
최초 등록일
2023.09.11
최종 저작일
2006.03
21페이지/파일확장자 어도비 PDF
가격 5,700원 할인쿠폰받기
다운로드
장바구니

* 본 문서는 배포용으로 복사 및 편집이 불가합니다.

서지정보

발행기관 : 한국건축역사학회 수록지정보 : 건축역사연구 / 15권 / 1호
저자명 : 우대성

영어 초록

This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

참고 자료

없음

자료문의

제휴사는 별도로 자료문의를 받지 않고 있습니다.

판매자 정보

코리아스칼라는 정직과 신뢰를 기반으로 학술단체 발전에 도움을 드리고자 하는 기업입니다. 본 사는 본 사가 자체 개발한 솔루션을 통하여 보다 효율적인 업무 관리 뿐만 아니라, 학술지의 데이터베이스화, ARCHIVE를 돕습니다. 본 사의 One Stop Service를 통해 국제적인 학술단체로 함께 도약 할 수 있다고 믿습니다.

주의사항

저작권 본 학술논문은 (주)코리아스칼라와 각 학회간에 저작권계약이 체결된 것으로 AgentSoft가 제공 하고 있습니다.
본 저작물을 불법적으로 이용시는 법적인 제재가 가해질 수 있습니다.
환불정책

해피캠퍼스는 구매자와 판매자 모두가 만족하는 서비스가 되도록 노력하고 있으며, 아래의 4가지 자료환불 조건을 꼭 확인해주시기 바랍니다.

파일오류 중복자료 저작권 없음 설명과 실제 내용 불일치
파일의 다운로드가 제대로 되지 않거나 파일형식에 맞는 프로그램으로 정상 작동하지 않는 경우 다른 자료와 70% 이상 내용이 일치하는 경우 (중복임을 확인할 수 있는 근거 필요함) 인터넷의 다른 사이트, 연구기관, 학교, 서적 등의 자료를 도용한 경우 자료의 설명과 실제 자료의 내용이 일치하지 않는 경우
최근 본 자료더보기
탑툰 이벤트
런던아이의 디자인 전개와 건립과정에 관한 연구
  • 레이어 팝업
  • 레이어 팝업
  • 레이어 팝업
  • 레이어 팝업