영어 초록
This paper seeks to present a multi-control method that can contribute to effective control of the production line with multiple bottleneck processes. The multi-control method is the production system that complements shortcomings of CONWIP and DBR, and it is designed to determine the raw material input according to the WIP level of two bottleneck processes and WIP level of total process. The effectiveness of the production system developed by applying the multi-control method was verified by the following three procedures. Raw material input conditions of the multi-control method are as follows. First, raw materials are go into the production line when the number of the total process WIP is lower than established number of WIP in total process and first process is idle. Second, raw materials are introduced when the number of WIP of two bottleneck processes is lower than the established number of WIP of each bottleneck process. Third, raw materials are introduced when the first process and in front of bottleneck process are idle even if the number of WIP in the total process is less than established number of WIP of the total process. The production line with two bottleneck processes was selected as the condition for production environment, and the production process modeling of CONWIP, DBR and multi-control production method was defined according to the production condition. And the optimum limited WIP level suitable for each system was obtained by applying a genetic algorithm to determine the total limited number of WIP of CONWIP, the limited number of WIP of DBR bottleneck process, the number of WIP in the total process of multi-control method and the limited number of WIP of bottleneck process. The limited number of WIP of CONWIP, DBR and multi-control method obtained by the genetic algorithm were applied to ARENA modeling, which is simulation software, and a simulation was conducted to derive result values on the basis of three criteria such as production volume, lead time and number of goods in-progress.참고 자료
없음"산업경영시스템학회지"의 다른 논문
- 사례 연구 : EN ISO 13849-1의 안전회로 설계를 위한 구체적 평가 기준의 적용8페이지
- 엘만 순환 신경망을 사용한 전력 에너지 시계열의 예측 및 분석10페이지
- 주력산업에서 가치전략과 재무성과의 상관관계14페이지
- 국내 주요 산업별 스케줄링 기법의 연구동향11페이지
- 간헐적 수요예측을 위한 이항가중 지수평활 방법9페이지
- 다수의 인공위성-지상국 간 통신 스케줄 최적화 모형11페이지
- 소셜 네트워크 서비스의 속성 : 분류와 비교15페이지
- ISO 13485 인증 시스템이 경영성과에 미치는 영향 분석 : 국내 의료기기 제조업을 대상으로13페이지
- 빅데이터 분석 기반의 오피니언 마이닝을 이용한 정보화 사업 평가 분석10페이지
- 공공데이터 생태계 조성을 위한 주요 국가별 정책에 관한 비교 분석12페이지