다중기계로 구성되는 조립전단계에서의 부품생산 일정계획
(주)코리아스칼라
- 최초 등록일
- 2023.04.05
- 최종 저작일
- 2003.10
- 4페이지/ 어도비 PDF
- 가격 3,000원
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 한국산업경영시스템학회
ㆍ수록지정보 : 한국산업경영시스템학회 학술대회
ㆍ저자명 : 윤상흠, 권용석
목차
Abstract
1. 서 론
2. 문제정의 및 분석
3. 분지한계법(branch-and-bound)
4. 수치실험
참고문헌
영어 초록
This paper considers a deterministic scheduling problem concerned with manufacturing multiple types of components at a pre-assembly stage composed of parallel fabrication machines. Each component part is machined on a fabrication machine specified in advance. The manufactured components are subsequently assembled into products. The completion time of a job(product) is measured by the latest completion time of its all components at the pre-assembly stage. To minimize the total weighted completion time of a finite number of jobs, a branch-and-bound scheme is developed.. Also, three constructive heuristic algorithms are developed based on the machine aggregation and greedy strategies. Some empirical evaluation of the performance of the proposed branch-and-bound algorithm are also performed.
참고 자료
없음
"한국산업경영시스템학회 학술대회"의 다른 논문
더보기 (5/10)