CFD를 이용한 병열 배열형 상향류식 침전지 수리해석에 관한 연구(Ⅱ) - 침전지 내 유입유량 균등성 향상을 위한 유입 분배수로 개선 -
(주)코리아스칼라
- 최초 등록일
- 2023.04.05
- 최종 저작일
- 2014.04
- 7페이지/ 어도비 PDF
- 가격 4,000원
* 본 문서는 배포용으로 복사 및 편집이 불가합니다.
서지정보
ㆍ발행기관 : 대한상하수도학회
ㆍ수록지정보 : 상하수도학회지 / 28권 / 2호
ㆍ저자명 : 박노석, 김성수, 최종웅, 왕창근
영어 초록
In order to suggest the methodology for improving the equity of flow distribution in open channel with multiple outlet, CFD simulations were carried out for actual scale distribution channel being operated in domestic G_WTP(Water Treatment Plant). Also, before and after installing the longitudinal multi hole(diameter=250 mm, 116 holes) baffle suggested by this research, turbidity measurements data were collected for evaluating the effects of hydraulic modification for inlet flow equity. From the both results, total turbidity of settled water was lowered by 30 % and equity of flow distribution was improved about 60 % compared with before hydraulic structure modification.
참고 자료
없음
"상하수도학회지"의 다른 논문
더보기 (4/9)