원저 : 한 대학병원의 수술실 이용 지연요인과 개선방안에 관한 연구

저작시기 2002.01 |등록일 2004.10.29 파일확장자어도비 PDF (pdf) | 19페이지 | 가격 5,400원
다운로드
장바구니관심자료
상세신규 배너

* 본 문서는 배포용으로 복사 및 편집이 불가합니다.

서지정보

발행기관 : 한국병원경영학회 수록지정보 : 한국병원경영학회지 / 7권 / 3호 / 44 ~ 62 페이지
저자명 : 김경애 ( Kyung Ae Kim ) , 유승흠 ( Seung Hum Yu ) , 김인숙 ( In Sook Kim ) , 손태용 ( Tae Yong Sohn ) , 박은철 ( Eun Cheol Park )

없음

영어 초록

Advanced surgical technology demands more precise, meticulous, and time-consuming procedures. In addition, the patient s preference of tertiary health providers makes over crowding of the University Hospitals. Therefore, it has been necessary to maximize utilization of the operating room of such hospitals to accommodate these requirements. This study, targeting 1,302 surgical cases performed in 22 operating rooms at a university hospital in Seoul from October 8 to November 1, 2001, analyzed reasons for delay, and factors that caused delayed use of operating rooms. This study also assessed that the rate of operating room use would increase if the sources for possible reform were improved. 1. Among total of 1,302 cases of surgery, the incidence of surgeries in which there were no time delays and no factors for delay were discovered is 71.4% or 930 cases: the incidence in which surgeries were delayed was 28.6% or 372 cases. 2. As results of logistic regression for delay, procedures involving womn were delayed 1.4 times more frequently than those of men. Compared to Department A, Department B was 1.8 times more likely to be delayed, and Department H was 0.4 times less likely to be delayed. Regional anesthesia was 2.4 times more likely to be delayed than general anesthesia, and surgeries that FCA was applied were 0.6 times less likely to be delayed than those when it was not. Surgeries performed on the Thursdw were 1.7 times more likely to be delayed than those performed on the Monday. Compared to surgeries performed between M:00-07:59, those performed between 08:00-08:29 were 4.3 times higher. 3. The reasons for delay were related to surgeon, surgical department, patient, anesthesia, administrative system, sick ward, and support services. Among these, 5,756 minutes for 276 delayed cases could be resolved easily, and resolving delays of 3,320 minutes for 131 cases would be more difficult. Among the causes for delay that could be improved, delays due to patient s transfer and surgeon s factor were the most common, 21.6% and 17.4% respectively. 4. If resolvable delays are improved, pre-anesthesia room is adrmnistered, and regional anesthesia and PCA are done ahead of time, use of emergency operating rooms will increase, we can increase overall utilization by 4.09%, we will save 744 minutes a day, we can reduce the time the operation room is used after 4 PM by Xi%, and we can resolve the operation cancellations due to insufficient operating rooms. For the increase in the use of operating rooms, we need to maximally decrease the delays that could be improved, by allocating block time based on used totals hours of elective cases, giving accurate information on surgery schedule, voluntary cooperation by staff participating in surgeries in reducing delay time, and the hospital management`s will to improve delay.

참고 자료

없음
  • 구매평가(0)
  • 구매문의(0)
      최근 구매한 회원 학교정보 보기
      1. 최근 2주간 다운받은 회원수와 학교정보이며
         구매한 본인의 구매정보도 함께 표시됩니다.
      2. 매시 정각마다 업데이트 됩니다. (02:00 ~ 21:00)
      3. 구매자의 학교정보가 없는 경우 기타로 표시됩니다.
      4. 지식포인트 보유 시 지식포인트가 차감되며
         미보유 시 아이디당 1일 3회만 제공됩니다.

      찾던 자료가 아닌가요?아래 자료들 중 찾던 자료가 있는지 확인해보세요

      상세하단 배너
      우수 콘텐츠 서비스 품질인증 획득
      최근 본 자료더보기
      상세우측 배너
      상세우측 배너
      상세우측 배너
      원저 : 한 대학병원의 수술실 이용 지연요인과 개선방안에 관한 연구
      페이지
      만족도 조사

      페이지 사용에 불편하신 점이 있으십니까?

      의견 보내기