선형 공정계획 모델의 작업 관계성 적용 방법

최초 등록일
2016.09.06
최종 저작일
2016.09
3페이지/파일확장자 어도비 PDF
가격 1,000원 할인쿠폰받기
판매자한국학술정보(주)
다운로드
장바구니

* 본 문서는 배포용으로 복사 및 편집이 불가합니다.

서지정보

발행기관 : 한국건축시공학회 수록지정보 : 한국건축시공학회 학술발표대회 논문집 / 10권 / 1호
저자명 : 류한국 ( Han Guk Ryu )

영어 초록

As linear scheduling method has been used since 1929, Empire State Building linear schedule, it is being applied in various fields such as construction and manufacturing. When addressing concurrent critical path occurring on linear schedule of construction, the empirical researches stress the resource management which should be applied for optimizing work flow, flexible work productivity and continuos resource allocation. However, work relationships has been usually overlooked for making the linear schedule from existing network schedule. Therefore, this research analyze the previous researches related to linear scheduling model and then propose the method that can be applied for adopting the relationships of network schedule to the linear schedule.

참고 자료

없음

자료문의

제휴사는 별도로 자료문의를 받지 않고 있습니다.

판매자 정보

한국학술정보(주)는 콘텐츠 제작에 도움이 되는 솔루션을 기반으로 풍부한 문화 콘텐츠를 생성하여 새로운 삶의 가치를 창조합니다.

본 학술논문은 한국학술정보(주)와 각 학회간에 저작권계약이 체결된 것으로 AgentSoft가 제공 하고 있습니다.
본 저작물을 불법적으로 이용시는 법적인 제재가 가해질 수 있습니다.

찾던 자료가 아닌가요?아래 자료들 중 찾던 자료가 있는지 확인해보세요

우수 콘텐츠 서비스 품질인증 획득
최근 본 자료더보기
선형 공정계획 모델의 작업 관계성 적용 방법