반복공정 최적 공법대안 선정 방법

최초 등록일
2016.09.06
최종 저작일
2016.09
2페이지/파일확장자 어도비 PDF
가격 1,000원 할인쿠폰받기
판매자한국학술정보(주)
다운로드
장바구니

* 본 문서는 배포용으로 복사 및 편집이 불가합니다.

서지정보

발행기관 : 한국건축시공학회 수록지정보 : 한국건축시공학회 학술발표대회 논문집 / 15권 / 1호
저자명 : 박상민 ( Sang Min Park ) , 이동은 ( Dong Eun Lee )

영어 초록

Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

참고 자료

없음

자료문의

제휴사는 별도로 자료문의를 받지 않고 있습니다.

판매자 정보

한국학술정보(주)는 콘텐츠 제작에 도움이 되는 솔루션을 기반으로 풍부한 문화 콘텐츠를 생성하여 새로운 삶의 가치를 창조합니다.

본 학술논문은 한국학술정보(주)와 각 학회간에 저작권계약이 체결된 것으로 AgentSoft가 제공 하고 있습니다.
본 저작물을 불법적으로 이용시는 법적인 제재가 가해질 수 있습니다.

우수 콘텐츠 서비스 품질인증 획득
최근 본 자료더보기
반복공정 최적 공법대안 선정 방법